The path from a stopped machine to a closed work order
A bearing fails on a stamping press. In a plant running ProAlert, every step below is a normal function of the platform, and none of them involves a file leaving one system and arriving in another.
- The stop is recorded against the asset, from a downtime call raised at the machine or from an EdgeSense device where one is fitted.
- The Availability component of that asset’s OEE reflects the stoppage without anyone entering it again.
- The call routes to the maintenance role configured for that press. The first responder to claim it is the only one dispatched, and every step of the response is timed.
- Where video is licensed, a clip covering the seconds before and after the stop is captured and attached to the record.
- A work order is created from the matching standard work template, already carrying the asset, the run, the product and the shift.
- The technician’s labor accrues against the work order from the moment the first task starts.
- The replacement part is consumed from a storeroom, inventory drops, and the reorder point raises a purchase requisition into the approval chain.
- Closure captures equipment, detail, cause and resolution against the ISO 14224 taxonomy, behind the responder’s PIN.
A plant running separate products typically performs steps 1, 3 and 5 in three of them, then reconciles the records afterward. See OEE, Maintenance and Shop-Floor Response in One System.