Materials and Inventory: Stock That Agrees With the Work Order
Waiting for parts is one of the most common causes of unplanned operator idle time, and it lands on the Availability half of your OEE (Overall Equipment Effectiveness) score. ProAlert keeps parts data where the decisions happen: attached to the work order, tracked against the preventive maintenance schedule, and visible to purchasing before stock runs out.
The bottom line: In most plants the parts list lives in a spreadsheet or an ERP (Enterprise Resource Planning) system that technicians rarely open. A technician finds the shelf empty, sends a verbal request to purchasing, and purchasing learns about the shortage when somebody tells them. Here the shortage is a record before it is a conversation.
Parts Inventory
ProAlert maintains a full parts master with categories, stock locations, bin assignments and unit of measure. Each part record carries the numbers that decide whether work can start:
| Field | Why it matters |
|---|---|
| On-hand quantity | What is physically at that location |
| Reserved quantity | Already committed to open work orders |
| Available quantity | On-hand minus reserved... the number that actually answers "can I start this job" |
| Reorder point and quantity | Drives low-stock exception reporting and purchase order triggers |
| Location and bin | Where to walk to, not just whether the plant owns one |
When a part is issued to a work order the on-hand quantity drops and the transaction is written automatically, so the next person to check sees the current picture rather than last night's report.
Stock Locations and Bins
Parts on Work Orders and PM Schedules
Technicians add parts to a work order before or during execution. Each line captures part number and description, quantity requested and used, unit and total cost, and return tracking for unused parts going back to stock. On multi-asset work orders, parts are tracked at the individual asset level so repair cost lands against the right asset for lifecycle costing.
Adding a part reserves it. Available quantity drops immediately, which is what stops a second technician unknowingly committing the same stock to a different job.
Each preventive maintenance schedule can carry its own parts list. When the PM generates a work order the required parts appear on it automatically, and purchasing sees the requirement weeks ahead through the planning board rather than on the morning the PM was due to run.
Requesting Materials From the Floor
An operator who needs material raises a request against the job that is actually running, from the work centre screen or a phone. Four things make it usable rather than another form:
Both the operator and the handler can attach notes, and the handler marks the request delivered to close it. Materials requesting is a separately licensed part of the platform, so a plant that only wants storeroom inventory is not obliged to roll it out to the floor.
Transaction History and Audit Trail
Every movement of a part writes an auditable record: receipts, issues to work orders, adjustments, transfers, returns and cycle counts. Each transaction carries the location it happened at and the quantity before and after it, which is what makes a balance reconstructable rather than merely current.
The history is queryable by part, location, date range and transaction type, and it is the data behind the consumption trends that feed forecasting. That supports inventory reconciliation, quality audits and cost accounting without a separate ERP query.
The Three Delays This Removes
| Delay | How ProAlert addresses it |
|---|---|
| Technician waits because the part is not in stock | Reorder points and forecasting surface the shortage before the work order is created |
| PM deferred because parts were not staged | The PM parts list is visible to purchasing weeks in advance |
| Wrong part ordered after a miscommunication | Part number, description and quantity flow from the PM or work order straight onto the purchase order |
Parts available when work orders are generated means maintenance happens on schedule. Maintenance on schedule keeps equipment running, and that lands back on OEE Availability, which is where the delay was costing you in the first place.
See available stock, not just on-hand stock.
Book a 30-minute demo... we'll reserve a part against a work order and watch the floor's available quantity move in the same second.