10 features
Shift Management
ProAlert's shift management system defines, schedules, and tracks every production shift... including planned downtime for breaks, lunches, and changeovers. Shift-aware OEE (Overall Equipment Effectiveness) ensures availability and performance calculations reflect what actually should have been running.
OEE without shift context is meaningless. ProAlert's shift system ensures your metrics are always calculated against planned production time (not raw clock time) giving you OEE numbers you can actually act on.
Shift Scheduling
-
Shift ConfigurationDefine shift start times and durations globally or per asset for 1st, 2nd, and 3rd shifts.
-
Per-Asset Schedule OverridesOverride shift times for specific assets on specific days to handle non-standard production schedules.
-
Multiple Shift SupportSupport for unlimited shift definitions... standard three-shift, continental, weekend, or custom.
-
Mobile Shift Start/StopOperators start and stop shifts from mobile with automatic production timeline creation.
-
Product Scheduling to ShiftsNEWAssign scheduled products to shift slots... mobile displays guidance on shift start.
Planned Downtime
-
Planned DT TypesPre-configured downtime categories: Break, Lunch, End of Shift, Changeover, Planned Maintenance.
-
Break & Lunch ManagementStart and end breaks from mobile with automatic duration tracking and OEE exclusion.
-
Schedule HUD (Heads-Up Display)Real-time visual of asset status across all configured shifts... who's running, who's not.
-
Shift History ViewHistorical event browser grouped by shift, run, and product context for post-shift review.
-
Run-Stop FinalizationNEWFinalize run data with tooling asset attribution and scrap entry at shift end.
See Shift Management in action.
Book a 30-minute live demo... we'll walk through your specific plant-floor challenges.